Project Details | Total Project Target |
JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | TOTAL |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22I00042 - Construction of Evacuation Center, Barangay Tambis, Hilongos, Leyte | FS | 9.16 | 0.00 | 0.00 | ||||||||||
% | 73.61 | 100.00 | 0.00 | 173.61 | ||||||||||
OI | Construction of Other Facilities | Construction of Other Facilities | Construction of Other Facilities | |||||||||||
EG | M:28 F: 0 | M:25 F: 0 | M:23 F: 0 | |||||||||||
22I00068 - Palo-Carigara-Ormoc Rd - K0931 + 000 - K0934 + 000 | FS | 0.00 | 19.54 | 53.14 | ||||||||||
% | 100.00 | 41.43 | 100.00 | 241.43 | ||||||||||
OI | Preventive Maintenance of Road: Asphalt Overlay | Preventive Maintenance of Road: Asphalt Overlay | Preventive Maintenance of Road: Asphalt Overlay | |||||||||||
EG | M:0 F: 0 | M:10 F: 0 | M:0 F: 0 | |||||||||||
22I00069 - Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + (-127) - K0910 + 000 | FS | 0.00 | 20.69 | 56.22 | ||||||||||
% | 100.00 | 41.56 | 100.00 | 241.56 | ||||||||||
OI | Preventive Maintenance of Road: Asphalt Overlay | Preventive Maintenance of Road: Asphalt Overlay | Preventive Maintenance of Road: Asphalt Overlay | |||||||||||
EG | M:0 F: 0 | M:10 F: 0 | M:0 F: 0 | |||||||||||
22IA0136 -Construction of 1-storey 3-classroom, Canila Elementary School, Biliran, Biliran | FS | 185270.85 | 515612.28 | 1471679.81 | 1637141.83 | 722439.81 | 1293982.92 | |||||||
% | 3.18 | 8.85 | 25.26 | 28.10 | 12.40 | 22.21 | 100 | |||||||
OI | Constructed 3.18% of 1-storey 3-classroom | Constructed 8.85% of 1-storey 3-classroom | Constructed 25.26% of 1-storey 3-classroom | Constructed 28.10% of 1-storey 3-classroom | Constructed 12.40% of 1-storey 3-classroom | Constructed 22.21% of 1-storey 3-classroom | ||||||||
EG | M:20 F: 0 | M:20 F: 0 | M:20 F: 0 | M:20 F: 0 | M:20 F: 0 | M:20 F: 0 | ||||||||
22IG0086, Emergency/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide Primary Roads Tacloban-Baybay South Road, K0999+200-K0999+380 | FS | 695103.69 | 1298622.95 | 1932814.09 | 1155667.15 | 308282.12 | ||||||||
% | 12.90 | 36.99 | 72.84 | 94.28 | 100.00 | 317.01 | ||||||||
OI | Square meter | Square Meter | Square Meter | Square Meter | Square Meter | |||||||||
EG | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | |||||||||
23I00007 - Construction of Flood Control Structure along Daguitan River Basin, Right Side Bank, Brgy. Poblacion, District VI, Burauen, Leyte | FS | 0.73 | 10678700.01 | 11.52 | ||||||||||
% | 0.66 | 20.72 | 51.77 | 73.15 | ||||||||||
OI | Construction of Flood Mitigation Structure | Construction of Flood Mitigation Structure | Construction of Flood Mitigation Structure | |||||||||||
EG | M:7 F: 0 | M:7 F: 0 | M:10 F: 0 | |||||||||||
23I00020 - Construction of Flood Control Structure along Solano River (Upstream), Brgy. San Miguel and Brgy. Atipolo, Tanauan, Leyte | FS | 1.20 | 11584281.85 | 15.12 | ||||||||||
% | 1.25 | 31.54 | 73.47 | 106.26 | ||||||||||
OI | Construction of Flood Mitigation Structure | Construction of Flood Mitigation Structure | Construction of Flood Mitigation Structure | |||||||||||
EG | M:10 F: 0 | M:10 F: 0 | M:0 F: 0 | |||||||||||
23I00127 - Improvement/Upgrading of access road & Construction of Multi purpose buiding in Brgy. 06, Guiuan Eastern Samar | FS | 4.61 | ||||||||||||
% | 14.36 | 14.36 | ||||||||||||
OI | Construction of Concrete Road | |||||||||||||
EG | M:10 F: 0 | |||||||||||||
23IA0003 - Construction Of Access Road Leading To Trades, Industries And Economic Zones, Nrj Villa Consuelo Connecting To Libtong Road In Support Of The Food & Resource-Based Processing, Naval, Biliran (11.564241, 124.487582 TO 11.560078, 124.4850 | FS | 905557.08 | 4639535.00 | 9228975.36 | 7598972.61 | 6797458.26 | 6728096.44 | 2635749.12 | ||||||
% | 2.35 | 12.04 | 23.95 | 19.72 | 17.64 | 17.46 | 6.84 | 100 | ||||||
OI | Constructed 0.029 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.240 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.479 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.394 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.352 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.349 Lane KM., .28m thick & 6.7m width road with drainage structures | Constructed 0.137 Lane KM., .28m thick & 6.7m width road with drainage structures | |||||||
EG | M:35 F: 0 | M:35 F: 0 | M:35 F: 0 | M:35 F: 0 | M:35 F: 0 | M:35 F: 0 | M:35 F: 0 | |||||||
23IA0021 - Construction of Caraycaray Flood Control along Biliran Circumferential Road, Phase V, Naval, Biliran (124.41571°, 11.55785° to 124.41736°, 11.55821°) | FS | 276705.66 | 550558.68 | 2981004.27 | 5756618.76 | 8061548.38 | 10780110.16 | 119810.70 | ||||||
% | 0.97 | 1.93 | 10.45 | 20.18 | 28.26 | 37.79 | 0.42 | 100 | ||||||
OI | Constructed of 2.37 Meters flood control structure | Constructed of 4.71 Meters flood control structure | Constructed of 25.49 Meters flood control structure | Constructed of 49.22 Meters flood control structure | Constructed of 68.93 Meters flood control structure | Constructed of 92.17 Meters flood control structure | Constructed of 1.02 Meters flood control structure | |||||||
EG | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | |||||||
23IA0031 - Construction of By-Pass and Diversion Roads - Pawikan-Esperanza Diversion Road, Biliran | FS | 118780.17 | 3495530.71 | 7582538.19 | 6469883.13 | 3097980.76 | 3476138.03 | |||||||
% | 0.49 | 14.42 | 31.28 | 26.69 | 12.78 | 14.34 | 100 | |||||||
OI | Constructed 0.007 lane km. road with Drainage and Slope Protection Structure | Constructed 0.206 lane km. road with Drainage and Slope Protection Structure | Constructed 0.448 lane km. road with Drainage and Slope Protection Structure | Constructed 0.382 lane km. road with Drainage and Slope Protection Structure | Constructed 0.183 lane km. road with Drainage and Slope Protection Structure | Constructed 0.205 lane km. road with Drainage and Slope Protection Structure | ||||||||
EG | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | ||||||||
23IA0058 - Construction of Amambahag Flood Control along Biliran Circumferential Road, Phase VI, Culaba, Biliran | FS | 648723.42 | 3178984.14 | 5280752.27 | 5457894.46 | 5280752.27 | 4091027.03 | |||||||
% | 2.71 | 13.28 | 22.06 | 22.80 | 22.06 | 17.09 | 100 | |||||||
OI | Constructed 7.72 Ln.M. Flood Control Structures | Constructed 37.85 Ln.M. Flood Control Structures | Constructed 62.87 Ln.M. Flood Control Structures | Constructed 64.98 Ln.M. Flood Control Structures | Constructed 62.87 Ln.M. Flood Control Structures | Constructed 48.71 Ln.M. Flood Control Structures | ||||||||
EG | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | ||||||||
23IA0076 - Completion of Multi-Purpose Building, Brgy. Magbangon, Cabucgayan, Biliran | FS | 35045.28 | 219272.37 | 1159175.23 | 501549.63 | |||||||||
% | 1.83 | 11.45 | 60.53 | 26.19 | 100 | |||||||||
OI | Completed 1.83% of f Two-Storey Multi-Purpose Building and other Fit-Out Works in Brgy. Magbangon, Cabucgayan, Biliran | Completed 11.45% of f Two-Storey Multi-Purpose Building and other Fit-Out Works in Brgy. Magbangon, Cabucgayan, Biliran | Completed 60.53% of f Two-Storey Multi-Purpose Building and other Fit-Out Works in Brgy. Magbangon, Cabucgayan, Biliran | Completed 26.19% of f Two-Storey Multi-Purpose Building and other Fit-Out Works in Brgy. Magbangon, Cabucgayan, Biliran | ||||||||||
EG | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | ||||||||||
23IA0078 - Concreting of Brgy. Marvel to Brgy. Looc FMR, Brgy. Marvel and Brgy. Looc, Culaba, Biliran (11.6514, 124.534114 to 11.648413, 124.534263) | FS | 617298.48 | 3914398.57 | 4103219.28 | 4389355.27 | 1500398.41 | ||||||||
% | 4.25 | 26.95 | 28.25 | 30.22 | 10.33 | 100 | ||||||||
OI | Road Concreting of 0.051 ln.km.,0.23m thick &5.0m width road with drainage | Road Concreting of 0.323 ln.km.,0.23m thick &5.0m width road with drainage | Road Concreting of 0.339 ln.km.,0.23m thick &5.0m width road with drainage | Road Concreting of 0.363 ln.km.,0.23m thick &5.0m width road with drainage | Road Concreting of 0.124 ln.km.,0.23m thick &5.0m width road with drainage | |||||||||
EG | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | |||||||||
23IA0125 - Construction of Multi-Purpose Building at Brgy. Calipayan, Culaba, Biliran | FS | 299391.77 | 1503287.44 | 1628399.12 | 1437080.48 | |||||||||
% | 6.15 | 30.88 | 33.45 | 29.52 | 100 | |||||||||
OI | Constructed 6.15% of 1-Storey Building | Constructed 30.88% of 1-Storey Building | Constructed 33.45% of 1-Storey Building | Constructed 29.52% of 1-Storey Building | ||||||||||
EG | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 | ||||||||||
23IB0001 Preventive Maintenance Secondary Roads Jct. Buenavista - Lawaan - Marabut Road k0992+354 - k0996+174 | FS | 349578.06 | ||||||||||||
% | 3.04 | 3.04 | ||||||||||||
OI | Road = 0.9340 lane km. Concrete Re-blocking = 207.57 blocks | |||||||||||||
EG | M:15 F: 0 | |||||||||||||
23IF0090 - Concreting of Brgy. Hinagbuan to Brgy. Belen to Brgy. Catigahan FMR, Brgy. Hinabuan, Brgy. Belen and Brgy. Catigahan, Palompon, Leyte | FS | 3.25 | ||||||||||||
% | 29.43 | 29.43 | ||||||||||||
OI | lane Km | |||||||||||||
EG | M:19 F: 0 | |||||||||||||
23IF0099 - CONSTRUCTION OF SOLAR WATER SYSTEM, ORMOC CITY, LEYTE | FS | 0.04 | ||||||||||||
% | 20.44 | 20.44 | ||||||||||||
OI | Number of Water Supply Systems | |||||||||||||
EG | M:25 F: 0 | |||||||||||||
23IG0001, Road Widening - Primary Roads- Tacloban-Baybay South Rd - K0992+361 - K0993+000, K1001+475 - K1001+581 | FS | 1872282.30 | 3871620.88 | 3744564.59 | 3871620.88 | 3744564.59 | 3871620.88 | 2996610.59 | ||||||
% | 7.81 | 23.96 | 39.58 | 55.73 | 71.35 | 87.50 | 100.00 | 385.93 | ||||||
OI | Lane Kilometer | Lane Kilometer | Lane Kilometer | Lane Kilometer | Lane Kilometer | Lane Kilometer | Lane Kilometer | |||||||
EG | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | M:25 F: 0 | |||||||
23IG0006, Construction of Road , Barangay Mapgap, Baybay City, Leyte | FS | 1500468.75 | 3100808.70 | 200222.55 | ||||||||||
% | 31.25 | 95.83 | 100.00 | 227.08 | ||||||||||
OI | Lane kilometer | Lane kilometer | Lane kilometer | |||||||||||
EG | M:15 F: 0 | M:15 F: 0 | M:15 F: 0 |